Quick Links
Project Details
Salient Features
Current Status
Protecting the Environment
Local Communites
Other Projects
Jorethang Loop HEP
Ting Ting HEP
Tashiding HEP
Project Details

Shiga Energy Pvt. Ltd. , an independent power producer signed an MOU with the Sikkim Government in September 2008 for the implementation of the 88 MW Ting Ting Hydro-Electric Project (JLHEP) on a  Build, Own, Operate and Transfer (BOOT) basis. The operational period extends for 35 years from commercial operation date of the project. Shiga Energy Pvt Ltd is promoted by the DANS Group. It is a special purpose vehicle for the implementation of Tashiding Hydro Electric Project. After review of the Feasibility study, the capacity of the project was increased from 88 MW to 97 MW in the Detailed Project Report. The DPR was approved by the Sikkim Power Development Corporation in March 2009